notes:backlog
Table of Contents
Backlog
Work that is real but cannot be scheduled yet — no date decided, or blocked behind something else. Nothing here sits on a day page, so it never carries over.
On hold — waiting on a date
- Ranikhet vaccination — batches 4, 5 and 6. Plan was LaSota eye drop for 4/5 and F1/B1 for batch 6. Batch 5 recovered from coccidiosis (amprolium finished 31 Oct) and is clear to vaccinate, but the date is undecided. Ask Balakumar for a date, then move this onto that day page.
- Vaccination note: batch 6 was given amprolium too; do not vaccinate mid-course.
Blocked — until fencing is confirmed
- Dig pits for jasmine — blocked until the fencing work is finished.
- Drip setup for jasmine — follows the pits, so also blocked on fencing.
- Big flower saplings — planting waits for fencing.
- Flooring for outer side of cow shed — waits for fencing.
- Remove mulberry — waits for fencing.
No farm/land work is scheduled until the fencing is confirmed done (user, 2026-11-12). Fencing follow-up and irrigation stay live; everything else waits here.
Notes
- Created 2026-11-12. Items move off this page onto a journal day page once they get a date or the blocker clears.
- See 12 Nov 2026 for the current day plan.
notes/backlog.txt · Last modified: by skvsree